Difference between revisions of "Helderberg:20110206-COCOHS"

From CTWUG Wiki
Jump to: navigation, search
(New page: = COCO HS - Phobos link - 6th February 2011 = == Participants == {| class="wikitable sortable" border="1" ! Helderberg |- | Coco |- | Noneza |- | Silvertubes |} == Plan == * Scan for Pho...)
 
(Pictures)
 
(2 intermediate revisions by the same user not shown)
Line 21: Line 21:
  
 
Connected to Phebos,  initial bandwidth tests resulted in 10Meg TX - 8Meg Rx
 
Connected to Phebos,  initial bandwidth tests resulted in 10Meg TX - 8Meg Rx
There is a tree line on the edge of the LOS to phobos,  potential to move the setup on COCO side to another region of the roof,  which eliminates the tree issue.
+
There is a tree line on the edge of the LOS to phebos,  potential to move the setup on COCO side to another region of the roof,  which eliminates the tree issue.
 
 
  
 
== Pictures ==
 
== Pictures ==
 
<gallery>
 
<gallery>
  
Image:Hb-mast-20110228-1.jpg|The mast
+
Image:Image:Bellville-phobos.JPG|COCO view : Bellville Phebos
 +
Image:Image:GB-SomersetWest-Strand.JPG|COCO view : Gordans Bay, Strand, Somerset West
 
</gallery>
 
</gallery>

Latest revision as of 16:19, 1 March 2011

COCO HS - Phobos link - 6th February 2011

Participants

Helderberg
Coco
Noneza
Silvertubes

Plan

  • Scan for Phobos
  • Connect POE and Mount with cable stay wire
  • Connect and do bandwidth tests
  • Mount SXT

Results

Connected to Phebos, initial bandwidth tests resulted in 10Meg TX - 8Meg Rx There is a tree line on the edge of the LOS to phebos, potential to move the setup on COCO side to another region of the roof, which eliminates the tree issue.

Pictures