Difference between revisions of "Helderberg:20101114-RageHSDiabolixMIMO"
From CTWUG Wiki
Bigmikedavis (talk | contribs) (→Gallery) |
(→Gallery) |
||
(4 intermediate revisions by one other user not shown) | |||
Line 21: | Line 21: | ||
* scarecrow cross-beam, with grids were added | * scarecrow cross-beam, with grids were added | ||
* stay-wire added to mast | * stay-wire added to mast | ||
+ | * scanned for Phebos | ||
+ | * Connected, but link was unusable | ||
* scanned for Diabolix | * scanned for Diabolix | ||
* Connected later, but link was unusable | * Connected later, but link was unusable | ||
− | + | * UPDATE: After some adjustment (frequencies and settings), the link is up and usable at 6Mbps each way. | |
− | * | ||
We are waiting for Diabolix to complete his portion of the MIMO setup. | We are waiting for Diabolix to complete his portion of the MIMO setup. | ||
Line 30: | Line 31: | ||
== Gallery == | == Gallery == | ||
{| class="wikitable sortable" border="0" | {| class="wikitable sortable" border="0" | ||
+ | |- | ||
+ | ! | ||
+ | ! | ||
+ | ! | ||
|- | |- | ||
| [[Image:Mimo-rb.jpg|thumb]] | | [[Image:Mimo-rb.jpg|thumb]] | ||
| [[Image:Mimo-connectors.jpg|thumb]] | | [[Image:Mimo-connectors.jpg|thumb]] | ||
+ | | [[Image:Dodgy-pmurgs1.jpg|thumb]] | ||
|- | |- | ||
− | |||
| [[Image:Scarecrow.jpg|thumb]] | | [[Image:Scarecrow.jpg|thumb]] | ||
− | |||
| [[Image:join-plate-front.jpg|thumb]] | | [[Image:join-plate-front.jpg|thumb]] | ||
| [[Image:join-plate-back.jpg|thumb]] | | [[Image:join-plate-back.jpg|thumb]] | ||
+ | |- | ||
+ | | [[Image:ChristmasRage.jpg|thumb]] | ||
|} | |} |
Latest revision as of 10:42, 15 November 2010
Contents
Rage HS Diabolix MIMO set - 14th November 2010
We have previously attempted to establish a link with Diabolix and have not been able to keep a stable link. The solution to this (as demonstrated with the pmurgs link) is http://en.wikipedia.org/wiki/MIMO.
Due to space constraints at Rage, we set up a cross-bar, upon which the Diabolix grids were placed, as far from each other as possible.
Participants
Rage |
---|
Bigmikedavis |
pmurgs |
Plan
Bigmikedavis and pmurgs meet up at 10am at Rage.
Results
The following was done:
- scarecrow cross-beam, with grids were added
- stay-wire added to mast
- scanned for Phebos
* Connected, but link was unusable
- scanned for Diabolix
* Connected later, but link was unusable * UPDATE: After some adjustment (frequencies and settings), the link is up and usable at 6Mbps each way.
We are waiting for Diabolix to complete his portion of the MIMO setup.