Helderberg:20100827-RageTritonDrakeScanDay

From CTWUG Wiki
Revision as of 22:57, 27 August 2010 by Bigmikedavis (talk | contribs)

Jump to: navigation, search

Scan Day - 27th August 2010

On the 27th August 2010, the Helderberg chapter of CTWUG is going to do a scan day, in order to check the feasibility of links between Rage HS/Relay Node , Triton HS and Drake HS/Relay Node

Participants

Rage

  • Marais
  • SaS
  • KaapseRebel

Triton

  • Wetkit
  • Amberdrake
  • pmurgs
  • SirPremacy

Drake

  • Drake
  • BigMikeDavis
  • SilverSurfer
  • Otto

Plan

The basic plan is for everyone to be at their respective HS location at 10am.

Triton

Wetkit, Amberdrake, pmurgs and SirPremacy will first set up a second grid at Triton and point it at Rage. Marais will then scan for this and check that a decent link is possible. Once this is complete, the grid will be pointed at Drake and a semi-permanent link will be established.

Rage

Marais will be scanning for Drake, Diabolix, Leda, and CTWUG_HS_Triton

Drake

Drake, BigMikeDavis and SilverSurfer will be at Drake at 9am for some Mercury grid tuning, as well as Rage test-kit setup. Some time after 10am, once the Rage crew is ready, a temporary link to Rage will be setup and tested.