Difference between revisions of "Helderberg:20100827-RageTritonDrakeScanDay"

From CTWUG Wiki
Jump to: navigation, search
(New page: = Scan Day - 27th August 2010 = On the 27th August 2010, the Helderberg chapter of CTWUG is going to do a scan day, in order to check the feasibility of links between [[Helderberg:HS/Rage...)
 
Line 26: Line 26:
  
 
=== Triton ===
 
=== Triton ===
Wetkit, Amberdrake, pmurgs and SirPremacy will first set up a second grid at Triton and point it at Rage. Marais will then scan for this and check that a decent link is possible. Once this is complete, the grid will be pointed at Drake and a semi-permanent link will be established.
+
Wetkit, Amberdrake, pmurgs and SirPremacy will first set up a second grid at Triton and point it at [[Helderberg:HS/Rage | Rage]]. Marais will then scan for this and check that a decent link is possible. Once this is complete, the grid will be pointed at [[Helderberg:HS/Drake]] and a semi-permanent link will be established.
  
 
=== Rage ===
 
=== Rage ===
Marais will be scanning for [[Drake]], [[Diabolix]], [[Leda]], and [[Triton]]
+
Marais will be scanning for [[Helderberg:HS/Drake]], [[Diabolix]], [[Leda]], and [[CTWUG_HS_Triton]]
  
 
=== Drake ===
 
=== Drake ===
 
Drake, BigMikeDavis and SilverSurfer will be at DrakeHome at 9am for some Mercury grid tuning, as well as Rage test-kit setup. Some time after 10am, once the Rage crew is ready, a temporary link to Rage will be setup and tested.
 
Drake, BigMikeDavis and SilverSurfer will be at DrakeHome at 9am for some Mercury grid tuning, as well as Rage test-kit setup. Some time after 10am, once the Rage crew is ready, a temporary link to Rage will be setup and tested.

Revision as of 22:55, 27 August 2010

Scan Day - 27th August 2010

On the 27th August 2010, the Helderberg chapter of CTWUG is going to do a scan day, in order to check the feasibility of links between Rage HS/Relay Node , Triton HS and Drake HS/Relay Node

Participants

Rage

  • Marais
  • SaS
  • KaapseRebel

Triton

  • Wetkit
  • Amberdrake
  • pmurgs
  • SirPremacy

Drake

  • Drake
  • BigMikeDavis
  • SilverSurfer
  • Otto

Plan

The basic plan is for everyone to be at their respective HS location at 10am.

Triton

Wetkit, Amberdrake, pmurgs and SirPremacy will first set up a second grid at Triton and point it at Rage. Marais will then scan for this and check that a decent link is possible. Once this is complete, the grid will be pointed at Helderberg:HS/Drake and a semi-permanent link will be established.

Rage

Marais will be scanning for Helderberg:HS/Drake, Diabolix, Leda, and CTWUG_HS_Triton

Drake

Drake, BigMikeDavis and SilverSurfer will be at DrakeHome at 9am for some Mercury grid tuning, as well as Rage test-kit setup. Some time after 10am, once the Rage crew is ready, a temporary link to Rage will be setup and tested.