Difference between revisions of "Helderberg:20100904-RageHSSetup"
Bigmikedavis (talk | contribs) (New page: = Rage HS Setup - 4th September 2010 = On the 4th September 2010, the Helderberg chapter of CTWUG is going to setup the initial backbone configuration of [[Helderberg:HS/Rage | Rage HS/Re...) |
(→Participants) |
||
(One intermediate revision by one other user not shown) | |||
Line 19: | Line 19: | ||
| Bigmikedavis | | Bigmikedavis | ||
|- | |- | ||
− | | | + | | [[pmurgs]] |
|} | |} | ||
Line 26: | Line 26: | ||
== Pictures == | == Pictures == | ||
+ | |||
+ | [[http://gallery.ctwug.za.net/main.php?g2_itemId=2865&g2_page=1 | Rage install pics]] |
Latest revision as of 14:11, 2 November 2010
Rage HS Setup - 4th September 2010
On the 4th September 2010, the Helderberg chapter of CTWUG is going to setup the initial backbone configuration of Rage HS/Relay Node . We will be establishing the following backbone links:
* Rage HS/Relay Node <=> Triton HS * Rage HS/Relay Node <=> Drake HS/Relay Node
We will also be installing a sector antenna for general use.
The overall intention of this configuration is to establish a triangle between the three sites so that we have a decent level of redundancy. This paves the way for the eventual move of the existing Triton HS <=> Mercury HS to Drake HS/Relay Node <=> Mercury HS, which all going well will happen once we are satisfied the backbone links are stable.
Participants
Rage | Drake |
---|---|
Marais | Drake |
Amberdrake | |
Bigmikedavis | |
pmurgs |
Plan
The basic plan is for us to be at the HS at 10am on Saturday. Once all of the installation work is done, we will first align a grid to Drake HS/Relay Node (Drake has time constraints), then we will align the other grid to Triton and see if establishing a usable link is possible.