Helderberg:20100918-Triton2GridRadioFixAndMercuryLinkMove
From CTWUG Wiki
Revision as of 16:45, 17 September 2010 by Bigmikedavis (talk | contribs) (New page: = Triton2 grid radio fix and Mercury link move - 18th September 2010 = On the 18th September 2010, the Helderberg chapter of CTWUG is going to do the following: * replace the Triton2 <=>...)
Contents
Triton2 grid radio fix and Mercury link move - 18th September 2010
On the 18th September 2010, the Helderberg chapter of CTWUG is going to do the following:
* replace the Triton2 <=> Rage radio * align the Triton2 <=> Rage grid * align the Triton1 <=> Drake grid * move our CTWUG link (to Mercury) from Triton HS to Drake HS/Relay Node.
PLEASE NOTE: The primary WUG connection for the area will be down for the entire morning. We expect it to be up and running again in the afternoon
Participants
Rage | Triton | Drake | Mercury |
---|---|---|---|
Marais | pmurgs | Drake | BigMikeDavis |
CuttingEdge | SilverSurfer | Tiffie | |
pmurgs | |||
SirPremacy |
Plan
There are two plans for this event:
Mercury link move
We will start this move at 9am and if all goes well it should be done before 10am.
Triton fixes and alignments
We will start this work at 10am:
* replace faulty radio on Triton2 * align Triton2 grid with Rage * align Triton1 grid with Drake (currently aligned with Mercury)