Helderberg:20100918-Triton2GridRadioFixAndMercuryLinkMove

From CTWUG Wiki
Revision as of 16:45, 17 September 2010 by Bigmikedavis (talk | contribs) (New page: = Triton2 grid radio fix and Mercury link move - 18th September 2010 = On the 18th September 2010, the Helderberg chapter of CTWUG is going to do the following: * replace the Triton2 <=>...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Triton2 grid radio fix and Mercury link move - 18th September 2010

On the 18th September 2010, the Helderberg chapter of CTWUG is going to do the following:

* replace the Triton2 <=> Rage radio
* align the Triton2 <=> Rage grid 
* align the Triton1 <=> Drake grid
* move our CTWUG link (to  Mercury) from  Triton HS to  Drake HS/Relay Node.

PLEASE NOTE: The primary WUG connection for the area will be down for the entire morning. We expect it to be up and running again in the afternoon

Participants

Rage Triton Drake Mercury
Marais pmurgs Drake BigMikeDavis
CuttingEdge SilverSurfer Tiffie
pmurgs
SirPremacy

Plan

There are two plans for this event:

Mercury link move

We will start this move at 9am and if all goes well it should be done before 10am.

Triton fixes and alignments

We will start this work at 10am:

* replace faulty radio on  Triton2
* align  Triton2 grid with Rage
* align  Triton1 grid with Drake (currently aligned with  Mercury)

Results

Pictures