Helderberg:20100918-Triton2GridRadioFixAndMercuryLinkMove

From CTWUG Wiki
Revision as of 14:12, 18 September 2010 by CuttingEdge (talk | contribs) (Removed whitespace from page links.)

Jump to: navigation, search

Triton2 grid radio fix and Mercury link move - 18th September 2010

On the 18th September 2010, the Helderberg chapter of CTWUG is going to do the following:

* replace the Triton 2 <=> Rage radio
* align the Triton 2 <=> Rage grid 
* align the Triton 1 <=> Drake grid
* move our Mercury CTWUG link from Triton HS to Drake HS/Relay Node.

PLEASE NOTE: The primary WUG connection for the area will be down for the entire morning. We expect it to be up and running again in the afternoon

Participants

Rage Triton HS Drake Mercury
Marais pmurgs Drake BigMikeDavis
CuttingEdge SilverSurfer Tiffie
Wetkit pmurgs

Plan

There are two plans for this event:

Mercury link move

We will start this move at 9am and if all goes well it should be done before 10am.

Triton fixes and alignments

We will start this work at 10am:

* replace faulty radio on Triton2
* align Triton2 grid with Rage
* align Triton1 grid with Drake (currently aligned with Mercury)

Results

Pictures

These images have been scaled to allow for smaller file size.