= Rage HS New RB for Diabolix and Pmurgs - 11th September 2010 =
 +
 +
The existing Rage1 RB has power issues (POE) and so we need to split the load between two RBs.
 +
 +
== Participants ==
 +
{| class="wikitable sortable" border="1"
 +
! Rage
 +
|-
 +
| Bigmikedavis
 +
|-
 +
|}
 +
 +
== Plan ==
 +
Bigmikedavis to meet Rage at 10am.
 +
 +
== Results ==
 +
=== Saturday ===
 +
A new RB (Rage2) was installed and set up, along with a second network cable and POE. The two RBs were joined by a short cable on the POE adapters. A third grid was installed for the pmurgs link. The install was rushed and alignment time had to be cut short because of extremely bad weather.
 +
 +
=== Tuesday ===
 +
Bigmikedavis went back to Rage and aligned both the Diabolix and Pmurgs grids.
 +
 +
== Pictures ==
 
<gallery>
 
<gallery>
 
Image:IMG_20101012_093300.jpg|One very busy mast  
 
Image:IMG_20101012_093300.jpg|One very busy mast  

Revision as of 12:19, 12 October 2010

Rage HS New RB for Diabolix and Pmurgs - 11th September 2010

The existing Rage1 RB has power issues (POE) and so we need to split the load between two RBs.

Participants

Rage
Bigmikedavis

Plan

Bigmikedavis to meet Rage at 10am.

Results

Saturday

A new RB (Rage2) was installed and set up, along with a second network cable and POE. The two RBs were joined by a short cable on the POE adapters. A third grid was installed for the pmurgs link. The install was rushed and alignment time had to be cut short because of extremely bad weather.

Tuesday

Bigmikedavis went back to Rage and aligned both the Diabolix and Pmurgs grids.