Helderberg:20101205-Rage2NewRbAndDiabolixOneGridHorizontal
From CTWUG Wiki
Revision as of 22:29, 11 December 2010 by Bigmikedavis (talk | contribs) (New page: = Rage HS Adjustments - 5th December 2010 = == Participants == {| class="wikitable sortable" border="1" ! Rage |- | Bigmikedavis |} == Plan == Bigmikedavis up at Rage during the day. ...)
Rage HS Adjustments - 5th December 2010
Participants
Rage |
---|
Bigmikedavis |
Plan
Bigmikedavis up at Rage during the day.
Results
The following was done:
- The rb493ah Rage2 rb was replaced with a 433ah rb in an attempt to resolve any possible power-related issues. No difference was found.
- One of the Diabolix grids was moved from vertical to horizontal polarisation.