Helderberg:20101205-Rage2NewRbAndDiabolixOneGridHorizontal
From CTWUG Wiki
Rage HS Adjustments - 5th December 2010
Participants
Rage |
---|
Bigmikedavis |
Plan
Bigmikedavis up at Rage during the day.
Results
The following was done:
- The rb493ah Rage2 rb was replaced with a 433ah rb in an attempt to resolve any possible power-related issues. No difference was found.
- One of the Diabolix grids was moved from vertical to horizontal polarisation.