Helderberg:20101205-Rage2NewRbAndDiabolixOneGridHorizontal

From CTWUG Wiki
Jump to: navigation, search

Rage HS Adjustments - 5th December 2010

Participants

Rage
Bigmikedavis

Plan

Bigmikedavis up at Rage during the day.

Results

The following was done:

  • The rb493ah Rage2 rb was replaced with a 433ah rb in an attempt to resolve any possible power-related issues. No difference was found.
  • One of the Diabolix grids was moved from vertical to horizontal polarisation.