Difference between revisions of "Sneaki"

From CTWUG Wiki
Jump to: navigation, search
Line 72: Line 72:
 
==RB Availibility==
 
==RB Availibility==
 
Two ether ports are still open - possible space for two sxt's
 
Two ether ports are still open - possible space for two sxt's
 
+
<br/><br/>
 
+
==Wug Log==
 +
<table>
 +
<tr><td style="width:100px">Aug 2011 </td><td> Started the project, connected to KM Node (grid to sector)</td></tr>
 +
<tr><td>Sep 2011 </td><td> Connected to Steamer, grid to panel </td></tr>
 +
<tr><td>Oct 2011 </td><td> Added new 31 dbi grid for new backbone (testing) </td></tr>
 +
<tr><td>Nov 2011 </td><td> Added grid on steamer side, grid to grid </td></tr>
 +
<tr><td>Dec 2011 </td><td> Testing to Johnny node for new backbone </td></tr>
 +
<tr><td>Jan 2012 </td><td> Add direct current to routerboard to increase output.  </td></tr>
 +
</table><br/><br/>
  
 
{{hsnav}}
 
{{hsnav}}

Revision as of 11:39, 11 January 2012

Sneaki
Sneaki1.jpg
High Site: Sneaki
SSID: http://ctwug.za.net/sneaki
WIND: Sneaki
Head Admin: Sneaki
Co Admins: None
Location: Kensington
Back Bone Links: None


Sneaki

In the beginning it was just to be connected to the CTWUG but I found this was not enough. I have learnt a lot from the CTWUG experience and would like to pass this onto other people as well. This node was setup in November 2011 with the main goal of getting more wuggers to join in the CTWUG community. Currently trying to get two backbone links running and also got a 5.8GHz sector for clients to connect to. Of course if you are thinking of connecting to this node please note the idea is to expand and create more links, hence i hope the connectees will follow course.

Check out our website http://km.ctwug.za.net (wug only access)
Planning a inet access soon.

Sneaki RB interfaces

Grid links

sneaki - steamer

  • BB: 27dBi R52nM MikroTik radio 5.8Ghz Vertical grid
  • SSID: sneaki-steamer

sneaki-johnny (planned project)

  • BB: 31dBi R52Hn MikroTik radio 5.8Ghz Vertical grid
  • SSID: sneaki-johnny

Sector

Sneak2.jpg


Clients



RB Availibility

Two ether ports are still open - possible space for two sxt's

Wug Log

Aug 2011 Started the project, connected to KM Node (grid to sector)
Sep 2011 Connected to Steamer, grid to panel
Oct 2011 Added new 31 dbi grid for new backbone (testing)
Nov 2011 Added grid on steamer side, grid to grid
Dec 2011 Testing to Johnny node for new backbone
Jan 2012 Add direct current to routerboard to increase output.


Template:Hsnav